Powering mobility — by the Electron Vector and the Hydrogen Vector.Same method for both.
Battery-electric · 2026-W46 · 2026-11-09 to 2026-11-15 · compiled 2026-11-16
Battery-electric weekly 2026-W46
Event of the week
The Bundesnetzagentur put Germany's publicly accessible charging points at 218,113 on 1 October 2026.[1][2]Details below
The Bundesnetzagentur put Germany's public charging points at 218,113 on 1 October 2026, 15.2 percent more than a year earlier, in figures it published on 13 November. The Kraftfahrt-Bundesamt's October data, released on 16 November, bring German battery-electric registrations for January to October to 698,230 cars (28.2 percent of the market), 31,284 lorries and 1,238 buses.
Battery-electric share of new passenger cars, Germany
37.0 %Oct 2026
+2.5 pp vs Sep 2026
Series starts: 2 checked values so far, a line needs 4.
Car, truck, bus and rail. Symmetric across both lines: identical definitions, bases and boundaries. Only this layer feeds convergence. This edition shows no convergence value: that is measured in the quarterly layer.
New registrations
First registrations of new units of a technology in a segment and region during the period [start, end].
KBA FZ 28.1 (October 2026 workbook, Veroeffentlichung 16. November 2026), row "Januar - Oktober 2026", Personenkraftwagen, column "Elektro (BEV)": 698,230. The same figure in KBA press release 46/2026 (16 Nov 2026): "Im Berichtszeitraum wurden 698.230 Elektro (BEV)* Pkw neu zugelassen". The October month (94,086 in the workbook) is the standing record 2026-W45:o1.
New registrations, battery-electric, trucks (vans excluded unless stated)
verified
4,169
Germany · October 2026
KBA class Lastkraftwagen (N1 to N3): includes light goods vehicles up to 3.5 t; tractor units are a separate KBA class and are not included · basis registry · next due 16 Dec 2026
KBA FZ 28.1, row "Oktober 2026", class Lastkraftwagen, column "Elektro (BEV)": 4,169 of 28,992 new Lastkraftwagen.
New registrations, battery-electric, trucks (vans excluded unless stated)
verified
31,284
Germany · January – October 2026
KBA class Lastkraftwagen (N1 to N3): includes light goods vehicles up to 3.5 t; tractor units are a separate KBA class and are not included · basis registry · next due 16 Dec 2026
KBA FZ 28.1, row "Januar - Oktober 2026", class Lastkraftwagen, column "Elektro (BEV)": 31,284 (January to September 27,115 in 2026-W42:o4 plus the October month 4,169).
New registrations, battery-electric, buses and coaches
verified
409
Germany · October 2026
KBA class Kraftomnibusse (M2, M3) · basis registry · next due 16 Dec 2026
KBA FZ 28.1, row "Januar - Oktober 2026", class Kraftomnibusse, column "Elektro (BEV)": 1,238 (January to September 829 in 2026-W42:o5 plus October 409).
New registrations, battery-electric, trucks (vans excluded unless stated)
verified
376
Spain · January – December 2025
Eurostat vehicle code LOR_GT3P5: lorries above 3.5 t (vans up to 3.5 t, VG_LE3P5, not included) · basis registry · next due 16 Dec 2026
Eurostat road_eqr_lormot, Spain, LOR_GT3P5, motor energy ELC ("Electricity"; plug-in hybrids are separate codes), year 2025: 376 (2024: 298). Dataset updated 2026-10-06 per the API "updated" field. Annual series; the latest year for Spain.
New registrations, battery-electric, trucks (vans excluded unless stated)
verified
5,575
European Union (27) · January – December 2024
Eurostat vehicle code LOR_GT3P5: lorries above 3.5 t (vans up to 3.5 t, VG_LE3P5, not included) · basis registry · next due 16 Dec 2026
Eurostat road_eqr_lormot, EU27_2020, LOR_GT3P5, motor energy ELC, year 2024: 5,575. The API returns no EU27_2020 value for 2025. Dataset updated 2026-10-06.
New registrations, battery-electric, buses and coaches
verified
479
Spain · January – December 2025
Eurostat: motor coaches, buses and trolley buses · basis registry · next due 16 Dec 2026
Eurostat road_eqr_busmot, Spain, motor energy ELC, year 2025: 479 (2024: 616). Dataset updated 2026-10-06. Trolley buses are included in the Eurostat class.
New registrations, battery-electric, buses and coaches
verified
6,616
European Union (27) · January – December 2024
Eurostat: motor coaches, buses and trolley buses · basis registry · next due 16 Dec 2026
Bundesnetzagentur, "Ladeinfrastruktur (LIS) in Zahlen", Stand 01. Oktober 2026, sheet "2. Aktueller Ueberblick DEU": Anzahl Ladepunkte Insgesamt 218,113 (Normalladepunkte 160,376, Schnellladepunkte 57,737; 1 Oct 2025: 189,288, +15.2 percent). The Bundesnetzagentur page (Stand 13.11.2026) states the same 160,376 and 57,737 points "die am 1. Oktober 2026 in Betrieb waren" and 9.57 GW charging capacity. Includes notifications from unfinished procedures. Power classes in the file (... 59-149, 149-299, >299 kW) do not match the schema boundary at 150 kW, so no split is recorded.
Share of new registrations
Share of a segment's new registrations in a region and period held by a technology.
KBA press release 46/2026 (16 Nov 2026): BEV "Das entspricht einem Anteil von 28,2 Prozent am Gesamtzulassungsvolumen" of 2,476,290 new passenger cars, January to October 2026 (+60.7 percent year on year). The October month share (37.0 percent) is the standing record 2026-W45:o2.
Comparisons
This publication shows a number only where two technologies really compete inside the core. Where they compete outside electro mobility the pair is "outside the core"; where there is no real contest it is "not comparable". Each carries its reason.
Segment
Scope
Pair
Outcome
Reason
all
BEV vs FCEV
not comparable
Charging points and hydrogen stations are different units of service; counts are never compared across technologies (compare throughput instead).
Technology depth
Asymmetric by nature: specific to battery-electric, and not used in any comparison.
Trading Economics (fetched 2026-11-16): "Cobalt traded flat at 33,525 USD/T on November 13, 2026"; monthly -14.79 percent. The underlying benchmark is not named; single secondary source.
Battery raw material price
inferred
30,333.88€/t
Global · 13 Nov 2026
material: cobalt, region: global, CFD tracking an unnamed cobalt benchmark (Trading Economics), unit: EUR/t, converted_from: o12, ecb_rate: 1.1052 · next due 23 Nov 2026
Trading Economics (fetched 2026-11-16 07:48 UTC): "Lithium fell to 89,550 CNY/T on November 16, 2026, down 3.03% from the previous day"; monthly -13.02 percent. Dated the compile date, after the window; the page states no date for the previous value (92,350), so no in-window value is recorded. No ECB rate for 16 November at compile time, so no EUR line.
Battery raw material price
reported
30.25CNY/mtu
China · 16 Nov 2026
material: manganese, region: North China, Tianjin port, manganese ore 32% Mn, South African origin (Trading Economics), unit: CNY/mtu · next due 23 Nov 2026
Trading Economics (fetched 2026-11-16): "Manganese traded flat at 30.25 CNY/mtu on November 16, 2026"; previous 30.25. An ore price per metric tonne unit, mainly a steel input: no EUR/t line exists for a per-mtu price. Dated after the window.
The week's movements
The Kraftfahrt-Bundesamt reported 698,230 newly registered battery-electric cars in Germany for January to October 2026, 28.2 percent of all new cars and 60.7 percent more than a year earlier; its October workbook adds 31,284 battery-electric Lastkraftwagen and 1,238 buses for the same ten months. [4][3]verified
The Bundesnetzagentur put Germany's publicly accessible charging points at 218,113 on 1 October 2026 (160,376 normal and 57,737 fast charging points, 9.57 GW), 15.2 percent more than the 189,288 of a year earlier. [1][2]verified
Battery recycler Tozero delivered its first recycled lithium carbonate to an industrial customer, from its Gendorf demonstration plant (just over 500 tonnes of battery waste a year). [11]reported
The German federal funding programme for charging points in multi-unit residential buildings (500 million euros, launched in March 2026) closed for applications; by 4 November about 21,400 applications had been filed and about 310 million euros committed. No successor programme has been decided. [12]reported
The German government plans to move 917 million euros into 2027 for the battery-electric car purchase premium. [13]reportedMore
The German government plans to move 917 million euros into 2027 for the battery-electric car purchase premium, raising the 2027 budget to 1.72 billion euros within an unchanged 3 billion euros for 2026 to 2029; payouts run at about 200 million euros a month. The budget committee still has to approve.
BYD is reported to be considering a battery factory on the former Galp refinery site in Matosinhos near Porto; capacity and investment are not stated and BYD has not confirmed. [14]unverified
Watchlist
When
What
Status
Why it matters
late November 2026
EAFO data update
Next EU27 and Spanish charging-point datasets; none appeared in the window although the October flash had announced 16 November.
late November 2026
ACEA car registrations for October (retrieved by hand when released)
EU27 battery-electric registrations and share for October.
December 2026
KBA FZ 27 stock at 1 October 2026
German battery-electric stock by vehicle class; the workbook still came back not found.
2026-12-01
ANFAC November registrations
Spanish battery-electric car registrations and share.
December 2026
BloombergNEF battery pack price survey
Annual pack-price benchmark; the publisher is not reachable from here, so only a hand-retrieved or second route will fill the cell.
December 2026
European Parliament plenary vote on the 2035 car CO2 target
Follows the committee votes of 4 November.
Caveats
Dates. The KBA October workbook (FZ 28) and press release 46/2026 are dated 16 November, the compile date and the day after the window; they are recorded with the dates they state and are not the event of the week.
More
The lithium and manganese prices are dated 16 November as well; the page shows no dated in-window value for them. The Bundesnetzagentur workbook states only its status date (1 October 2026); its publication inside the window rests on the Bundesnetzagentur page, dated 13.11.2026, which carries the same figures, and on the previous run, which still found the 1 September status on 9 November.
Registrations. German truck figures are the KBA class Lastkraftwagen (N1 to N3, vans included); Eurostat lorry figures are above 3.5 t only.
More
The Spanish and EU27 truck and bus registrations are annual Eurostat values (Spain 2025, EU27 2024, the latest years the API returns), a different series from the monthly KBA data; they fill cells that were empty because ACEA publishes electrically chargeable vehicles only. Spanish car figures are republished DGT data (ANFAC) and stay reported.
ACEA. ACEA's crawling policy disallows the agent, so no ACEA page was requested, and no hand-retrieved ACEA fragment arrived for this week.
More
The EU27 car registration and share cells are therefore not reachable; their latest values are the September figures checked by hand on 2 November.
Charging points. The Bundesnetzagentur count includes notifications from procedures not yet completed; its power classes break at 149 and 299 kW, not at the schema boundary of 150 kW, so only the total is recorded.
More
The EAFO datasets for the EU27 and Spain are unchanged and no EAFO data update appeared in the window.
Raw materials. All raw-material prices come from one secondary aggregator.
More
Cobalt (13 November, in the window) is recorded in USD with a separate EUR line at the ECB reference rate of the same day. Lithium carbonate and manganese ore are recorded in their original currency only, dated 16 November, with no ECB rate for that day. Manganese is an ore price per metric tonne unit, mainly a steel input. Nickel gave three different values in one fetch and is not recorded; graphite has no price on the page.
Cost per 100 km. From W46 a cost line needs the schema reference consumption, which has no value yet; the MITECO figures (unchanged since 23 September) are therefore not recorded again, and the EU27 cell has no admissible region under the new definition.
Global cells. All global cells are empty: the IEA answers with a bot-protection page and no IEA data file has been retrieved by hand.
Battery depth definitions. Grid-connection queue and recycling capacity stay empty as schema gaps; pack prices are not reachable (BloombergNEF refused by our access route).
News reach. Company and policy news was read on a German trade-press site (electrive.net; its day archives answered with a Cloudflare block, its feed and articles were readable), so those movements are reported or unverified.
More
Runners-up for the event of the week: the end of the German charging-funding programme for multi-unit buildings (10 November; trade press only, the ministry's page was not read), the planned shift of 917 million euros for the car purchase premium (10 November; trade press citing a newspaper, the budget document was not read), Tozero's first recycled lithium carbonate delivery (11 November; trade press citing the company), the reported BYD battery plant in Portugal (10 November; a newspaper's unnamed source, unconfirmed), and the KBA October release (primary and verified, but dated 16 November, after the window).
Coverage and gaps
12 new observations
13 unchanged
37 not retrieved
1 comparisons refused
Specification coverage — core basis (car, truck, bus, rail × BEV, FCEV): 22 of 127 (17%). Old basis (all segments and technologies): 22 of 155 (14%). The core share is higher because ship, aviation and the hydrogen derivatives left the core, not because more figures were found.
An empty cell is a finding. How the gaps arise is explained in Method.