Hydrogen and derivatives · 2026-W46 · 2026-11-09 to 2026-11-15 · compiled 2026-11-16

Hydrogen and derivatives weekly 2026-W46

Event of the week

HydrogenPro reported third-quarter revenues of NOK 7 million and cash of NOK 25 million on 9 November. [1] [2] Details below

HydrogenPro, a tracked electrolyser maker, said on 13 November that its strategic review has found no financing and that its board is assessing whether the company can continue as a going concern. Spanish day-ahead power averaged 160.72 EUR/MWh and German (DE-LU) 244.57 EUR/MWh over 9 to 15 November.

Electrolyser statements per week, Europe

1 statement W46

Series starts: 1 checked value so far, a line needs 4.

Source: HydrogenPro ASA, 13 Nov 2026 · verified

Values (1)
PeriodValueStatusSource
W46 20261 statementverifiedHydrogenPro ASA, 13 Nov 2026

Electro Mobility core

Car, truck, bus and rail. Symmetric across both lines: identical definitions, bases and boundaries. Only this layer feeds convergence. This edition shows no convergence value: that is measured in the quarterly layer.

New registrations

First registrations of new units of a technology in a segment and region during the period [start, end].

SegmentTechnologyRegionValueQualifiersBasisAs ofNext dueStatusSources
Passenger carsFCEVDE6registry2026-10-01 → 2026-10-312026-12-16verified[3]
Trucks (vans excluded unless stated)FCEVDE0KBA class Lastkraftwagen (N1 to N3): includes light goods vehicles up to 3.5 t; tractor units are a separate KBA class and are not includedregistry2026-10-01 → 2026-10-312026-12-16verified[3]
Buses and coachesFCEVDE0KBA class Kraftomnibusse (M2, M3)registry2026-10-01 → 2026-10-312026-12-16verified[3]
Passenger carsH2-ICEDE0registry2026-10-01 → 2026-10-312026-12-16inferred[3] [4]
Trucks (vans excluded unless stated)H2-ICEDE0KBA class Lastkraftwagen (N1 to N3): includes light goods vehicles up to 3.5 t; tractor units are a separate KBA class and are not includedregistry2026-10-01 → 2026-10-312026-12-16inferred[3] [4]
Buses and coachesH2-ICEDE0KBA class Kraftomnibusse (M2, M3)registry2026-10-01 → 2026-10-312026-12-16inferred[3] [4]

Technology depth

Asymmetric by nature: specific to hydrogen and derivatives, and not used in any comparison.

prices

MetricSubjectRegionValueQualifiersAs ofNext dueStatusSources
Day-ahead power price—ES160.72 €/MWhstatistic: weekly_mean, series: marginalpdbc2026-11-09 → 2026-11-152026-11-23verified[5] [6] [7] [8] [9] [10] [11]
Day-ahead power price—DE244.57 €/MWhstatistic: weekly_mean, series: smard_de_lu2026-11-09 → 2026-11-152026-11-23verified[12] [13]
TTF natural gas—EU2791 €/MWhstatistic: intraday2026-11-132026-11-23unverified[14]
European Hydrogen Bank bid price—EU270.44 €/kgauction: IF25, statistic: lowest_bid2026-05-072027-11-16verified[15]
European Hydrogen Bank bid price—EU273.49 €/kgauction: IF25, statistic: highest_bid2026-05-072027-11-16verified[15]

production pipeline

MetricSubjectRegionValueQualifiersAs ofNext dueStatusSources
Final investment decisions (count)—ES12026-11-09 → 2026-11-152026-11-23reported[16]
Final investment decisions (capacity)—ES150 MW2026-11-09 → 2026-11-152026-11-23reported[16]

projects

MetricSubjectRegionValueQualifiersAs ofNext dueStatusSources
Project statusRepsol Tarragona electrolyserESfid2026-11-122026-11-23reported[16]
Project electrolyser capacityRepsol Tarragona electrolyserES150 MW2026-11-122026-11-23reported[16]
Project annual outputRepsol Tarragona electrolyserES22,000 t/yr2026-11-122026-11-23reported[16]

electrolysers

MetricSubjectRegionValueQualifiersAs ofNext dueStatusSources
Electrolyser OEM order signalHydrogenProNOdeterioratingstatement: Q3 2026 revenues NOK 7 million against NOK 15 million in Q2 20262026-07-01 → 2026-09-302026-11-23verified[1]
Electrolyser OEM order signalHydrogenProNOdeterioratingstatement: final investment decisions pending; conversion of the pipeline into firm orders depends on them; project timelines continue to be affected2026-11-132026-11-23verified[1]
Electrolyser OEM order signalHydrogenProNOdeterioratingstatement: strategic review has not resulted in a financing solution; going concern under assessment2026-11-132026-11-23verified[1]

The week's movements

Watchlist

WhenWhatStatusWhy it matters
2026-11-30KBA FZ 27 stock at 1 October 2026 (fz27_202610.xlsx)pendingCame back not found on 2026-11-16; the 1 July stock appeared on 31 August, so the October stock is expected around the end of November.
2026-12-02ANFAC November 2026 release on electrified and low-emission registrations (Spain)pendingPublished on the first working days of the following month.
2026-11-30European Hydrogen Bank IF25: grant agreement signatures, expected September to November 2026 per the Commission pagependingNo signature reported by 16 November; the nine selected projects are still "invited to GAP".
2026-11-23Commission consultations on a new EU hydrogen strategy closependingOpened 26 October; adoption of a communication indicated for Q4 2026.
2026-12-31HydrogenPro financing updatependingThe board said it will update the market on alternative financing measures; going concern under assessment (13 November).
2026-11-23Bad Lauchstädt first hydrogen: confirm on a readable pagependingReported in listings for 10 November; would move the project from building to commissioning.

Caveats

Prices. Spanish day-ahead is the mean of 672 quarter-hour OMIE prices (marginalpdbc, Spanish field, column-checked by the retrieval script); German day-ahead is the DE-LU bidding zone mean of 672 SMARD quarter-hour prices (series smard_de_lu), confirmed by the Energy-Charts API.

More

TTF is a news-stream level of a contract for difference (approximately 91 EUR/MWh on 13 November, after a two-week high above 94 the same day), recorded as unverified from a single secondary source; the page header and statistics table of the same fetch disagree (87.30 against 88.35) and are not used. No EUA value: the method rules asks for the EEX settlement of the last trading day, and the EEX market data hub renders its prices only with JavaScript while its data host is refused by our access route.

Registrations. German October 2026 registrations come from KBA FZ 28 (published 16 November 2026, the compile date).

More

KBA's class Lastkraftwagen includes light goods vehicles (N1); one fuel-cell tractor unit registered in October sits in the separate class Zugmaschinen and is not counted as a truck. The KBA column "Wasserstoff" is recorded as H2-ICE with status inferred because KBA does not define it. KBA FZ 27 (stock at 1 October) and ANFAC November are not yet published; standing values carry over.

Refuelling. No dated hydrogen station opening, closure, pump price or dispensed volume was found for 9 to 15 November 2026: h2.live shows nothing after 28 September, the Observatory station file is still the May 2026 snapshot, and electrive.net carried no hydrogen station item from 4 to 15 November. pv magazine, h2-international and sustainable-bus feeds were refused (crawling policy or access route).

More

The Hyundai NEXO page still states both 826 km and 700 km, so no range and fill-time pair is recorded.

Definitions. cost_per_100km stays empty for DE and EU27: the method rules requires a reference consumption with a source that the schema does not yet hold (car:FCEV value null), and EU27 is no longer a region of the metric from W46 although the research specification still lists FCEV EU27 as a P1 cell.

Week's event. The event is HydrogenPro's stock exchange notice of 13 November (primary, read): no financing solution from the strategic review and a going-concern assessment.

More on this event

Runners-up: Repsol's approval of the 150 MW Tarragona electrolyser (12 November), the most consequential project news of the week, read only as a Hydrogen Europe republication of the company announcement because the Repsol press room is refused (no primary read); Topsoe and Sasol's licence for the Alby e-SAF plant (12 November, primary, read; a technology selection for a project whose FID is due in 2028); first hydrogen at Bad Lauchstädt (10 November, date and content only in search listings); Plug Power's Q3 results (9 November, listings only); the CEEC electrolyser tender shortlist (11 November, listings only); the Luxembourg approval of the first phase of the HY4Link pipeline (reported 9 November by Hydrogen Europe, but approved on 28 October, outside the window).

FIDs. No source tallies final investment decisions worldwide for a week.

More

The Repsol Tarragona decision is recorded as a lower bound for Spain (at least one decision, at least 150 MW), from a single secondary source; the worldwide cells stay empty. Zero is never assumed.

Hydrogen Bank. IF25 bid prices are the lowest (EUR 0.44/kg) and highest (EUR 3.49/kg) of the eleven projects the Commission lists as selected; the page gives no prices for the other admissible bids or for the four reserve-list projects, and no weighted mean.

More

The prices differ widely by topic (maritime-aviation bids near EUR 3.5/kg), so the range spans topics. No IF24 or IF23 bid prices were recorded in this run.

Electrolysers. The Observatory electrolyser cost dataset (reference year 2025) gives CAPEX by component only; no system total is stated, so none is recorded.

More

HydrogenPro's three rows are separate statements of one notice (revenue, order conversion, financing). Plug Power's Q3 results and ITM Power's general meeting could not be read; Sunfire's site is refused at its apex host.

Reach. Newly reachable: the European Hydrogen Observatory (observatory.clean-hydrogen.europa.eu; earlier runs tried hydrogen-observatory.eu, a different host), HydrogenPro's stock exchange notices and Siemens Energy's release pages.

More

Newly closed: pv magazine now answers crawling policy Disallow: / to the fetcher, so the source of the HyScale 100 cancellation cannot be re-checked. Still refused (refusal by our access route or bot protection): the newsrooms of Repsol, Moeve, Iberdrola, Enagas, Uniper, VNG, Shell, bp, Linde, Salzgitter, thyssenkrupp Steel, EWE, Lhyfe, ArcelorMittal, Iqony, Plug Power, ITM Power and Sunfire, the SEC, wire services, the IEA and most trade press; Hydrogen Insight and gasworld disallow by crawling policy.

Projects. Nine German and Spanish project statuses are carried as unchanged against the Observatory projects dataset (situation December 2025), which was re-read and has no newer file; it is a slow source and may lag events.

More

Bad Lauchstädt is not carried as unchanged because listings report first hydrogen on 10 November. HydroHub Fenne: an undated Observatory profile and January 2026 listings that report it stopped disagree; nothing recorded.

Coverage and gaps

16 new observations
60 unchanged
81 not retrieved
0 comparisons refused

Specification coverage — core basis (car, truck, bus, rail × BEV, FCEV): 13 of 127 (10%). Old basis (all segments and technologies): 13 of 155 (8%). The core share is higher because ship, aviation and the hydrogen derivatives left the core, not because more figures were found.

An empty cell is a finding. How the gaps arise is explained in Method.

What could not be found (81 rows)
MetricSegmentTechnologyRegionWhy
EU ETS allowanceall road segments—EU27source not reachable
Hydrogen pump priceall road segments—DEchecked, nothing new
Levelised cost of hydrogenall road segments—DEsource not reachable
Levelised cost of hydrogenall road segments—ESsource not reachable
Hydrogen station openings minus closuresall road segments—DEchecked, nothing new
Hydrogen station openings minus closuresall road segments—ESchecked, nothing new
Hydrogen station openings minus closuresall road segments—EU27checked, nothing new
Vehicle stockPassenger carsFCEVEU27no source for this metric
Vehicle stockTrucks (vans excluded unless stated)FCEVEU27no source for this metric
Vehicle stockBuses and coachesFCEVEU27no source for this metric
Vehicle stockPassenger carsFCEVglobalsource not reachable
Vehicle stockTrucks (vans excluded unless stated)FCEVglobalsource not reachable
Vehicle stockBuses and coachesFCEVglobalsource not reachable
Vehicle stockPassenger carsH2-ICEEU27no source for this metric
Vehicle stockPassenger carsH2-ICEglobalsource not reachable
New registrationsPassenger carsFCEVEU27no source for this metric
New registrationsTrucks (vans excluded unless stated)FCEVEU27no source for this metric
New registrationsBuses and coachesFCEVEU27no source for this metric
New registrationsTrucks (vans excluded unless stated)FCEVESno source for this metric
New registrationsBuses and coachesFCEVESno source for this metric
New registrationsPassenger carsFCEVglobalsource not reachable
New registrationsTrucks (vans excluded unless stated)FCEVglobalsource not reachable
New registrationsBuses and coachesFCEVglobalsource not reachable
New registrationsPassenger carsH2-ICEEU27no source for this metric
New registrationsPassenger carsH2-ICEglobalsource not reachable
New registrationsTrucks (vans excluded unless stated)H2-ICEEU27no source for this metric
New registrationsBuses and coachesH2-ICEEU27no source for this metric
Share of new registrationsPassenger carsFCEVESno source for this metric
Share of new registrationsPassenger carsFCEVDEno source for this metric
Share of new registrationsPassenger carsFCEVEU27source not reachable
Share of new registrationsPassenger carsFCEVglobalsource not reachable
Infrastructure countall road segmentsFCEVglobalsource not reachable
Infrastructure throughputall road segmentsFCEVDEchecked, nothing new
Infrastructure throughputall road segmentsFCEVglobalsource not reachable
Infrastructure utilisationall road segmentsFCEVEU27no source for this metric
Infrastructure utilisationall road segmentsFCEVglobalsource not reachable
Infrastructure closuresall road segmentsFCEVDEchecked, nothing new
Infrastructure closuresall road segmentsFCEVESchecked, nothing new
Infrastructure closuresall road segmentsFCEVEU27checked, nothing new
Range per fill eventPassenger carsFCEVEU27no source for this metric
Refuel or charge timePassenger carsFCEVEU27no source for this metric
Electricity per 100 km, well-to-wheelPassenger carsFCEVEU27source not reachable
Cost per 100 kmPassenger carsFCEVDEno source for this metric
Cost per 100 kmPassenger carsFCEVEU27no source for this metric
Water intensityPassenger carsFCEVEU27not checked this week
Material intensityPassenger carsFCEVEU27not checked this week
Final investment decisions (count)all road segments—globalno source for this metric
Final investment decisions (capacity)all road segments—globalno source for this metric
Installed electrolysis capacityall road segments—globalsource not reachable
Electrolyser system CAPEXall road segments—europeno source for this metric
Electrolyser system efficiencyall road segments—europeno source for this metric
Electrolyser stack lifetimeall road segments—europeno source for this metric
Electrolyser factory utilisationall road segments—europesource not reachable
Global hydrogen demandall road segments—globalsource not reachable
Low-emissions hydrogen productionall road segments—globalsource not reachable
2030 project pipelineall road segments—globalsource not reachable
Share of Europe's 2030-target projects at FIDall road segments—EU27source not reachable
Project water per kg H2all road segments—EU27no source for this metric
Water disclosure shareall road segments—EU27no source for this metric
Project statusall road segments—ES-ANsource not reachable
Project statusall road segments—ES-ANsource not reachable
Project statusall road segments—ESsource not reachable
Project statusall road segments—ESsource not reachable
Project statusall road segments—DEsource not reachable
Project statusall road segments—DEsource not reachable
Project statusall road segments—DEsource not reachable
Project statusall road segments—DEsource not reachable
Project statusall road segments—DEsource not reachable
Project statusall road segments—DEsource not reachable
Project statusall road segments—DEsource not reachable
Project statusall road segments—DEsource not reachable
Project annual outputall road segments—ES-ANsource not reachable
Project water intakeall road segments—ES-ANsource not reachable
Project water intakeall road segments—ESsource not reachable
Project water intakeall road segments—ES-ANsource not reachable
Electrolyser OEM order signalall road segments—DEchecked, nothing new
Electrolyser OEM order signalall road segments—USsource not reachable
Electrolyser OEM order signalall road segments—GBsource not reachable
Electrolyser OEM order signalall road segments—DKchecked, nothing new
Electrolyser OEM order signalall road segments—DEsource not reachable
Electrolyser OEM order signalall road segments—DEchecked, nothing new
Checked, unchanged (60 rows)
MetricSegmentTechnologyRegion
Levelised cost of hydrogenall road segments—NL
Vehicle stockPassenger carsFCEVDE
Vehicle stockTrucks (vans excluded unless stated)FCEVDE
Vehicle stockBuses and coachesFCEVDE
Vehicle stockPassenger carsH2-ICEDE
Vehicle stockTrucks (vans excluded unless stated)H2-ICEDE
Vehicle stockBuses and coachesH2-ICEDE
Vehicle stockPassenger carsFCEVES
Vehicle stockBuses and coachesFCEVES
Vehicle stockTrucks (vans excluded unless stated)FCEVES
Vehicle stockall road segmentsFCEVES
Vehicle stockPassenger carsHYD_FCELLEU27
Vehicle stockPassenger carsHYD_FCELLDE
Vehicle stockPassenger carsHYD_FCELLES
Vehicle stockBuses and coachesHYD_FCELLEU27
Vehicle stockBuses and coachesHYD_FCELLDE
Vehicle stockBuses and coachesHYD_FCELLES
Vehicle stockall road segmentsHYD_FCELLEU27
Vehicle stockall road segmentsHYD_FCELLDE
Vehicle stockall road segmentsHYD_FCELLES
Vehicle stockTrucks (vans excluded unless stated)HYD_FCELLEU27
Vehicle stockTrucks (vans excluded unless stated)HYD_FCELLDE
New registrationsPassenger carsFCEVES
New registrationsall road segmentsFCEVES
New registrationsPassenger carsHYD_FCELLEU27
New registrationsPassenger carsHYD_FCELLDE
New registrationsPassenger carsHYD_FCELLES
New registrationsBuses and coachesHYD_FCELLEU27
New registrationsBuses and coachesHYD_FCELLDE
New registrationsBuses and coachesHYD_FCELLES
Infrastructure countall road segmentsFCEVDE
Infrastructure countall road segmentsFCEVES
Infrastructure countall road segmentsFCEVEU27
Infrastructure countall road segmentsFCEVeurope
European Hydrogen Bank auction budgetall road segments—EU27
European Hydrogen Bank auction budgetall road segments—EU27
European Hydrogen Bank auction budgetall road segments—EU27
European Hydrogen Bank awarded amountall road segments—EU27
European Hydrogen Bank awarded amountall road segments—EU27
European Hydrogen Bank awarded amountall road segments—EU27
European Hydrogen Bank awarded capacityall road segments—EU27
European Hydrogen Bank awarded capacityall road segments—EU27
Installed electrolysis capacityall road segments—europe
Installed electrolysis capacityall road segments—DE
Installed electrolysis capacityall road segments—ES
Installed electrolysis capacityall road segments—EU27
Electrolyser manufacturing capacityall road segments—europe
Project statusall road segments—ES-AN
Project statusall road segments—ES
Project statusall road segments—DE
Project statusall road segments—DE
Project statusall road segments—DE
Project statusall road segments—DE
Project statusall road segments—DE
Project statusall road segments—DE
Project statusall road segments—DE
Project statusall road segments—DE
Project electrolyser capacityall road segments—ES-AN
Project electrolyser capacityall road segments—DE
Electrolyser OEM order signalall road segments—NO

Sources

  1. HydrogenPro ASA – Third quarter 2026 results and update on strategic review (stock exchange notice, Oslo, 13 November 2026) — HydrogenPro ASA, published 2026-11-13, primary, confidence high
  2. HydrogenPro stock exchange notices (list; newest entries 13 November 2026: Q3 2026 results, chief financial officer resigns) — HydrogenPro ASA, published 2026-11-13, primary, confidence high
  3. KBA, Neuzulassungen von Kraftfahrzeugen mit alternativem Antrieb (FZ 28), Oktober 2026, sheet FZ 28.1 (Impressum: Veröffentlichung 16. November 2026; sha256 67f1a185239a4cd2…) — Kraftfahrt-Bundesamt, published 2026-11-16, primary, confidence high
  4. KBA, Methodische Erläuterungen zu Statistiken über Fahrzeugzulassungen (FZ), Stand Februar 2024, Begriffsbestimmungen — Kraftfahrt-Bundesamt, published 2024-02-01, primary, confidence high
  5. OMIE day-ahead marginal price file marginalpdbc, delivery day 2026-11-09 (sha256 96e2f4870c840d5d…, column-checked against INT_PBC_EV_H_1) — OMIE, published 2026-11-09, primary, confidence high
  6. OMIE day-ahead marginal price file marginalpdbc, delivery day 2026-11-10 (sha256 ef0a96d680dbe894…, column-checked against INT_PBC_EV_H_1) — OMIE, published 2026-11-10, primary, confidence high
  7. OMIE day-ahead marginal price file marginalpdbc, delivery day 2026-11-11 (sha256 02857c09621722b3…, column-checked against INT_PBC_EV_H_1) — OMIE, published 2026-11-11, primary, confidence high
  8. OMIE day-ahead marginal price file marginalpdbc, delivery day 2026-11-12 (sha256 cefee1fc43f705bf…, column-checked against INT_PBC_EV_H_1) — OMIE, published 2026-11-12, primary, confidence high
  9. OMIE day-ahead marginal price file marginalpdbc, delivery day 2026-11-13 (sha256 16a744305ad85ff1…, column-checked against INT_PBC_EV_H_1) — OMIE, published 2026-11-13, primary, confidence high
  10. OMIE day-ahead marginal price file marginalpdbc, delivery day 2026-11-14 (sha256 560355c737a6918e…, column-checked against INT_PBC_EV_H_1) — OMIE, published 2026-11-14, primary, confidence high
  11. OMIE day-ahead marginal price file marginalpdbc, delivery day 2026-11-15 (sha256 a795e91e9296ed84…, column-checked against INT_PBC_EV_H_1) — OMIE, published 2026-11-15, primary, confidence high
  12. SMARD (Bundesnetzagentur), Großhandelspreis Deutschland/Luxemburg (filter 4169), quarter-hour series, week of 9 November 2026 (sha256 46212b79b812b178…; last value 15 November 2026 23:45 CET) — Bundesnetzagentur (SMARD), published 2026-11-15, primary, confidence high
  13. Energy-Charts API, day-ahead price DE-LU, 9 to 15 November 2026 (data from Bundesnetzagentur, republished; sha256 f0cb759003574a88…) — Fraunhofer ISE (Energy-Charts), published 2026-11-15, secondary, confidence high
  14. EU Natural Gas TTF, news stream items dated 13 November 2026 ("Snap 3-Day Gain", "Climb to 2-Week High"; CFD-tracked levels) — Trading Economics, published 2026-11-13, secondary, confidence medium
  15. IF25 Hydrogen Auction (Climate Action, European Commission): results tables with bid price per selected project; publication of results 7 May 2026; page last updated 19 June 2026 — European Commission, DG Climate Action, published 2026-06-19, primary, confidence high
  16. Repsol Approves €400M Investment in 150MW Green Hydrogen Plant at Tarragona Refinery (Hydrogen Europe, Members News; republication of the company announcement) — Hydrogen Europe, published 2026-11-12, secondary, confidence medium
  17. Topsoe and Sasol selected for e-SAF project in Sweden (press release, 12 November 2026) — Topsoe A/S, published 2026-11-12, primary, confidence high
  18. NOT READ: CEEC announced shortlist of tender for 176 electrolysers (newsletter; seen only as a search listing) — China Hydrogen (newsletter), published 2026-11-11, secondary, confidence low
  19. NOT READ: Energiepark Bad Lauchstädt produces green hydrogen for the first time (Uniper press release; seen only as a search listing, host refused by our access route) — Uniper SE, published 2026-11-10, primary, confidence low
  20. NOT READ: Plug Power third-quarter 2026 results, Form 8-K exhibit 99.1 (seen only as a search listing; host refused by our access route) — Plug Power Inc. (SEC EDGAR filing), published 2026-11-09, primary, confidence low